2 overflows, 1 reaching surface water
Fiscal-year rate 10.98 per 100 miles and 18,142 gallons per 100 miles — the State Water Board benchmark metrics.
249 miles of gravity main, 6 miles of force main, 17 lift stations — April 2026
2 overflows, 1 reaching surface water
Fiscal-year rate 10.98 per 100 miles and 18,142 gallons per 100 miles — the State Water Board benchmark metrics.
74.0% of work orders preventive
795 work orders closed, 35.4 miles cleaned, 25 emergency responses and 20 after-hours callouts.
1 of 17 lift stations flagged for action
Driven by run-time imbalance, alarm counts or overdue generator testing.
13,647 ft at PACP grade 4–5
Estimated $5.6M of rehabilitation demand feeding the CIP pipeline.
| Spill ID | Date | Location | Category | Est. gal | To surface water | Cause | Response |
|---|---|---|---|---|---|---|---|
| SSO-2026-31 | 04/02/2026 | 2938 Road 20, Richmond | Category 1 | 2,853 | 157 | Roots | 87 min |
| SSO-2026-30 | 04/12/2026 | 2328 Giaramita St, San Pablo | Category 3 | 1,134 | — | FOG | 68 min |
| SSO-2026-29 | 03/26/2026 | 2374 Appian Way, Pinole | Category 3 | 1,845 | — | Debris | 43 min |
| SSO-2026-28 | 03/13/2026 | 1113 Market Ave, Pinole | Category 3 | 1,083 | — | Pipe Structural Failure | 88 min |
| SSO-2026-27 | 03/12/2026 | 1151 Hilltop Dr, San Pablo | Category 3 | 2,257 | — | Pipe Structural Failure | 41 min |
| SSO-2026-26 | 03/10/2026 | 1240 Hilltop Dr, Rollingwood | Category 3 | 1,456 | — | Debris | 48 min |
| SSO-2026-25 | 02/17/2026 | 2130 Road 20, Tara Hills | Category 3 | 2,351 | — | Capacity | 81 min |
| SSO-2026-24 | 02/24/2026 | 3304 Hilltop Dr, Tara Hills | Category 3 | 1,877 | — | FOG | 49 min |
| SSO-2026-23 | 02/10/2026 | 3864 San Pablo Ave, El Sobrante | Category 3 | 1,541 | — | Pump Station Failure | 42 min |
| SSO-2026-22 | 01/18/2026 | 933 Church Ln, El Sobrante | Category 3 | 2,129 | — | Pump Station Failure | 55 min |
| SSO-2026-21 | 01/17/2026 | 688 San Pablo Ave, Pinole | Category 2 | 877 | 76 | Roots | 70 min |
| SSO-2026-20 | 01/05/2026 | 1527 San Pablo Ave, Richmond | Category 2 | 558 | 149 | FOG | 54 min |
| SSO-2026-19 | 01/04/2026 | 1657 Road 20, Richmond | Category 3 | 1,388 | — | Capacity | 41 min |
| SSO-2026-18 | 01/15/2026 | 3650 San Pablo Ave, San Pablo | Category 3 | 1,145 | — | Roots | 44 min |
State Water Board benchmark basis: 10.98 spills and 18,142 gallons per 100 miles of collection system, fiscal year to date — the metric used for regional peer comparison in CIWQS.
13,647 ft at Grade 4–5 — estimated rehabilitation need $5,622,564
| Station | Run hrs | Starts | Alarms | Generator test | Last insp. |
|---|---|---|---|---|---|
| LS-01 Rumrill | 207.5 | 1,032 | 2 | Current | 04/10/2026 |
| LS-02 Giant Rd | 269.9 | 587 | 5 | Current | 04/14/2026 |
| LS-03 Hilltop | 98.2 | 1,572 | 2 | Current | 04/09/2026 |
| LS-04 Parr | 70.3 | 634 | 7 | Current | 04/02/2026 |
| LS-05 Church Ln | 158.8 | 860 | 5 | Current | 04/22/2026 |
| LS-06 Vale | 299.7 | 737 | 3 | Current | 04/09/2026 |
| LS-07 Wildcat | 334.5 | 2,945 | 4 | Overdue | 04/19/2026 |
| LS-08 Bayview | 301.7 | 726 | 3 | Current | 04/12/2026 |
| LS-09 Tara Hills | 66.4 | 2,939 | 3 | Current | 04/09/2026 |
| LS-10 Pinole Creek | 329.0 | 606 | 0 | Current | 04/18/2026 |
| LS-11 Atlas | 317.6 | 1,281 | 4 | Current | 04/28/2026 |
| LS-12 San Pablo Dam | 112.2 | 1,193 | 6 | Current | 04/06/2026 |
| LS-13 Broadway | 315.6 | 2,610 | 4 | Current | 04/06/2026 |
| LS-14 El Portal | 354.2 | 2,207 | 2 | Current | 04/22/2026 |
| LS-15 Verde | 155.1 | 1,627 | 5 | Current | 04/20/2026 |
| LS-16 Sanford | 261.2 | 1,370 | 5 | Current | 04/28/2026 |
| LS-17 Market | 183.0 | 1,191 | 5 | Current | 04/18/2026 |
| Request | Received | Problem | Address | Response | Status | Result |
|---|---|---|---|---|---|---|
| SR-2026-04000 | 04/20/2026 | Locate Request | 371 Church Ln, El Sobrante | 96 min | Closed | Root Cut |
| SR-2026-04001 | 04/26/2026 | Manhole Overflow | 111 Rumrill Blvd, Pinole | 68 min | Closed | Repaired |
| SR-2026-04002 | 04/28/2026 | Debris/Obstruction | 2238 Market Ave, Richmond | 267 min | Closed | No Agency Responsibility |
| SR-2026-04003 | 04/12/2026 | Locate Request | 3377 Road 20, Richmond | 191 min | Closed | No Agency Responsibility |
| SR-2026-04004 | 04/04/2026 | Locate Request | 1776 San Pablo Ave, El Sobrante | 191 min | Closed | Cleared — Hydroflush |
| SR-2026-04005 | 04/19/2026 | Debris/Obstruction | 3192 Parr Blvd, Richmond | 60 min | Open | Pending |
| SR-2026-04006 | 04/12/2026 | Sewer Backup | 1555 Appian Way, Pinole | 45 min | Closed | No Agency Responsibility |
| SR-2026-04007 | 04/26/2026 | Debris/Obstruction | 1279 May Rd, Rollingwood | 105 min | Closed | No Agency Responsibility |
| SR-2026-04008 | 04/19/2026 | Lateral Inquiry | 2694 San Pablo Ave, Pinole | 121 min | Closed | Cleared — Hydroflush |
| SR-2026-04009 | 04/27/2026 | Odor Complaint | 3810 San Pablo Ave, Bayview | 53 min | Closed | Root Cut |
| SR-2026-04010 | 04/11/2026 | Odor Complaint | 1815 Appian Way, Bayview | 84 min | Closed | Repaired |
| SR-2026-04011 | 04/14/2026 | Locate Request | 2264 Willow Ave, San Pablo | 57 min | Closed | Referred to CCTV |
| SR-2026-04012 | 04/23/2026 | Sewer Backup | 2442 May Rd, Bayview | 120 min | Closed | Repaired |
| SR-2026-04013 | 04/30/2026 | Lateral Inquiry | 3263 Appian Way, Richmond | 101 min | Closed | No Agency Responsibility |
| SR-2026-04014 | 04/22/2026 | Lateral Inquiry | 1262 Market Ave, Rollingwood | 199 min | Closed | Repaired |
| SR-2026-04015 | 04/22/2026 | Debris/Obstruction | 1969 Hilltop Dr, Pinole | 94 min | Closed | No Agency Responsibility |
| Work order | Template | Category | Asset | Crew | Labor hrs | Equip hrs | Material | Total cost | Status |
|---|---|---|---|---|---|---|---|---|---|
| WO-2026-0400 | Root Control Treatment | Preventive | Gravity Main · GM-4394 | Hydro Crew | 23.2 | 4.9 | $1,816 | $4,425 | Closed |
| WO-2026-0401 | Pump Rebuild | Corrective | Lift Station · LS-04 | CSO Crew B | 21.2 | 1.5 | $2,949 | $5,101 | Closed |
| WO-2026-0402 | Manhole Inspection & Repair | Corrective | Manhole · MH-10396 | Electrical/I&C | 15.7 | 5.7 | $2,284 | $4,236 | Closed |
| WO-2026-0403 | Root Control Treatment | Preventive | Gravity Main · GM-4560 | Electrical/I&C | 3.9 | 7.0 | $2,975 | $3,895 | Closed |
| WO-2026-0404 | Spot Repair — Point Excavation | Capital | Gravity Main · GM-4259 | CSO Crew A | 8.0 | 4.6 | $1,413 | $2,540 | Closed |
| WO-2026-0405 | Emergency Backup Response | Emergency | Lateral · GM-4737 | Mechanical Crew | 3.1 | 2.8 | $3,095 | $3,611 | Open |
| WO-2026-0406 | Gravity Main Cleaning | Preventive | Gravity Main · GM-4191 | Electrical/I&C | 11.4 | 2.4 | $1,076 | $2,358 | Closed |
| WO-2026-0407 | Spot Repair — Point Excavation | Capital | Gravity Main · GM-4740 | CSO Crew A | 22.8 | 5.1 | $2,100 | $4,687 | In Progress |
| WO-2026-0408 | Emergency Backup Response | Emergency | Lateral · GM-4611 | Mechanical Crew | 11.6 | 0.8 | $848 | $2,024 | Closed |
| WO-2026-0409 | Manhole Inspection & Repair | Corrective | Manhole · MH-10843 | CCTV Crew | 15.1 | 8.5 | $3,026 | $5,139 | Closed |
| WO-2026-0410 | Root Control Treatment | Preventive | Gravity Main · GM-4656 | Mechanical Crew | 10.3 | 1.7 | $2,983 | $4,104 | Closed |
| WO-2026-0411 | Manhole Inspection & Repair | Corrective | Manhole · MH-10264 | Electrical/I&C | 16.8 | 6.7 | $1,076 | $3,211 | Closed |
| WO-2026-0412 | Pump Rebuild | Corrective | Lift Station · LS-12 | Hydro Crew | 14.5 | 5.1 | $1,206 | $2,996 | Closed |
| WO-2026-0413 | Emergency Backup Response | Emergency | Lateral · GM-4172 | CSO Crew A | 22.1 | 8.9 | $2,629 | $5,445 | Open |
| WO-2026-0414 | Root Control Treatment | Preventive | Gravity Main · GM-4749 | Electrical/I&C | 5.4 | 4.5 | $2,398 | $3,267 | Closed |
| WO-2026-0415 | Root Control Treatment | Preventive | Gravity Main · GM-4498 | CSO Crew A | 8.1 | 7.0 | $1,442 | $2,766 | Closed |
| WO-2026-0416 | Emergency Backup Response | Emergency | Lateral · GM-4703 | CSO Crew B | 19.1 | 1.6 | $3,267 | $5,225 | Closed |
| WO-2026-0417 | Manhole Inspection & Repair | Corrective | Manhole · MH-10741 | CCTV Crew | 2.4 | 1.8 | $1,315 | $1,686 | Closed |
| WO-2026-0418 | Pump Rebuild | Corrective | Lift Station · LS-08 | Hydro Crew | 7.4 | 6.2 | $348 | $1,542 | Closed |
| WO-2026-0419 | Root Control Treatment | Preventive | Gravity Main · GM-4002 | CSO Crew A | 7.2 | 0.9 | $214 | $975 | Closed |