Source: Esri ArcGIS

Asset Network & Condition

Spatial inventory, age and material profile, and risk-ranked renewal candidates

Permit headroom6.95 / 12.50 MGD — 44.4% headroom
NPDES CA0038539

Key insights — Apr 26

Derived from this page’s source data
Network

249 miles gravity main, 6 miles force main, 17 lift stations

Asset register conformed from ArcGIS and joined to Cityworks maintenance history.

Condition

42.5 miles at grade 4–5

Roughly 17% of the gravity network sits in poor or immediate-attention condition.

Coverage

58.2% CCTV-inspected in five years

Uninspected mileage is the largest source of unquantified risk in the condition model.

Risk gap

1 top-risk segment with no CIP project

Highest likelihood-times-consequence assets not yet tied to a funded project number.

Gravity main
249.0 mi
6,142 segments
Force main
6.0 mi
38 segments
Manholes / lift stations
6,318 / 17
point assets
Replacement value
$1008.6M
current-dollar estimate
Inspected last 5 yrs
58.2%
CCTV coverage

Service area schematic

stylized — not survey grade
San Pablo BayLS-01LS-02LS-03LS-04LS-05LS-06LS-07LS-08LS-09LS-10LS-11LS-12LS-13LS-14LS-15LS-16LS-17WPCPPinoleEl SobranteSan PabloRichmond

The District serves approximately 100,000 residents across San Pablo, Richmond, El Sobrante, Pinole and unincorporated Contra Costa County. Trunk alignments and station locations are illustrative.

Condition profile

miles by structural grade
Grade 1 — Excellent88.4 mi
36%
Grade 2 — Good71.2 mi
29%
Grade 3 — Fair46.9 mi
19%
Grade 4 — Poor28.1 mi
11%
Grade 5 — Immediate14.4 mi
6%
Asset inventory
ClassQuantityAvg ageRepl. value
Gravity Main249.0 mi54 yr$742.0M
Force Main6.0 mi41 yr$31.4M
Manhole6,318 ea52 yr$63.2M
Lift Station17 ea38 yr$48.9M
Lateral (public portion)58.4 mi56 yr$121.0M
Air/Vacuum Valve84 ea27 yr$2.1M
Replacement value from the 2024 asset management plan basis.

Pipe age and material profile

miles by install decade

Vitrified clay pipe installed between the 1940s and 1960s carries the largest share of the network and accounts for the majority of root-intrusion and structural defects observed in CCTV.

Risk matrix

likelihood × consequence of failure
Consequence →
170
160
129
122
107
157
169
155
151
81
180
195
140
119
118
188
183
201
163
121
245
209
210
206
191
Likelihood of failure →

461 assets fall in the high-risk quadrant and drive the renewal program's prioritization.

Highest-risk segments

risk score = likelihood × consequence
Asset IDLocationDiameterMaterialInstalledPACP gradeRisk scoreIn CIP
GM-4471Hilltop Dr @ Robert Miller15"VCP1952524CIP-24-108
GM-4188Rumrill Blvd @ Market Ave12"VCP1948522CIP-25-114
GM-3907Church Ln @ Road 2010"Concrete1961420CIP-25-114
FM-0006Parr Blvd force main18"DIP1978420CIP-26-121
GM-4620Giaramita St @ Brookside8"VCP1955418
Segments without a CIP reference are renewal candidates not yet programmed.
Illustrative data generated for demonstration purposes — not West County Wastewater records. Prepared by BI Consulting Services.